Suratgarh–Bathinda line
3 ft 3+3⁄8 in) Metre gauge
Route map | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Suratgarh–Bathinda line or Suratgarh–Shri Ganganagar–Bathinda line is a railway route on the North Western Railway zone and Northern Railway zone of Indian Railways. This route plays an important role in rail transportation of Bikaner division of Rajasthan state and Fazilka district, Sri Muktsar Sahib district and Bathinda district of Punjab.
The corridor passes through the Desert Area of Rajasthan and runs with a stretch of 264 km with consists of two branch lines, the first branch line starts from Sarupsar Junction and ends at Anupgarh with a stretch of 56 km, whereas the second branch line starts from Abohar Junction and ends at Fazilka Junction with a stretch of 43 km.
History
The main railway line from Suratgarh Junction to Bathinda Junction via Shri Ganganagar was originally built by Bikaner State Railway company of Bikaner Princely State and Southern Punjab Railway of Punjab Province portion as metre-gauge line was constructed on different phases.
- The first phase, from Suratgarh Junction to Rai Singh Nagar was opened on 1 October 1925.
- The second phase, from Rai Singh Nagar to Kesrisinghpur was opened on 1 September 1927.
- The third phase, from Kesrisinghpur to Shri Ganganagar Junction was opened on 1 May 1926.
- The fourth phase, from Bathinda Junction to Hindumalkote (the portion of Delhi–Bathinda–Mcleodganj–Sammasatta line) was opened on 10 November 1897.[1]
- The Fifth phase, from Hindumalkote to Shri Ganganagar Junction was opened on 1970.[2]
Whereas, the branch line from Sarupsar Junction to Anupgarh which comes under the portion of Bikaner State Railway was opened on 30 March 1929.[3]
After that, the conversion of main line into 5 ft 6 in (1,676 mm) broad gauge was sanctioned in 1997–98,[4] Which it was important for military purpose because this railway line also passes through nearest of International border of India, was opened in different sections.[5]
- The first phase, between Shri Ganganagar and Sarupsar Junction was opened on 9 June 2012.[6]
- The second phase, between Suratgarh and Anupgarh was opened on 25 July 2013.[7]
After that, the new branch line between Abohar Junction and Fazilka was started construction on 2004 [8] for easier transport of nearby Indian International borders and after some years it was opened on 12 July 2012.[9]
Trains Passing through this line
- Kochuveli–Shri Ganganagar Junction Express
- Bikaner–Delhi Sarai Rohilla Superfast Express
- Hazur Sahib Nanded–Shri Ganganagar Weekly Express
- Firozpur Cantonment–Shri Ganganagar Express
References
- ^ "Indian Railways history". Retrieved 6 November 2012.
- ^ "Hindumalkot Railway station in Sri ganganagar district". Patrika.
- ^ "Administration report on Indian Railways 1939" (PDF). Retrieved 25 July 2021.
- ^ "Achievement of Construction Department during year 2016-17". India Rail Info. Retrieved 3 July 2021.
- ^ "COMMITTEE ON PETITIONS NINTH REPORT" (PDF). Government of India. Retrieved 17 July 2021.
- ^ "Broad gauge track at Sriganganagar". Times of India. Retrieved 17 May 2021.
- ^ "Suratgarh Anupgarh Passenger Inauguration" (PDF). North Western Railways. Government of India. Retrieved 17 May 2021.
- ^ "Nitish lays Fazilka-Abohar line foundation". Times of India. 2 February 2004.
- ^ "Abohar Fazilka rail line to be operational soon". Times of India. 11 July 2012.
- v
- t
- e
trunk lines
sections
- Agra–Bhopal section
- Ahmedabad–Udaipur line
- Allahabad–Mau–Gorakhpur main line
- Ambala–Attari line
- Amritsar–Khem Karan line
- Amritsar–Pathankot line
- Aunrihar–Jaunpur line
- Barauni–Gorakhpur, Raxaul and Jainagar lines
- Bathinda–Rewari line
- Bathinda–Rajpura line
- Bikaner–Rewari line
- Bhanupli–Leh line
- Chandigarh–Sahnewal line
- Delhi–Fazilka line
- Delhi–Kalka line
- Delhi–Meerut–Saharanpur line
- Delhi–Moradabad line
- Jalandhar–Firozpur line
- Jalandhar–Jammu line
- Jammu–Baramulla line
- Jodhpur–Bathinda line
- Jodhpur–Jaisalmer line
- Kanpur–Delhi section
- Laksar–Dehradun line
- Lucknow–Gorakhpur line
- Lucknow–Moradabad line
- Ludhiana–Fazilka line
- Ludhiana–Jakhal line
- Marwar Junction–Munabao line
- Mathura–Vadodara section
- Mau–Ghazipur–Dildarnagar main line
- Merta Road–Rewari line
- Moradabad–Ambala line
- Mughalsarai–Kanpur section
- Rewari–Rohtak line
- Shri Ganganagar–Sadulpur line
- Suratgarh–Bathinda line
- Varanasi–Chhapra line
- Varanasi–Lucknow main line
- Varanasi–Rae Bareli–Lucknow line
- Varanasi–Sultanpur–Lucknow line
rail transport
- Delhi Suburban Railway
- Delhi Metro (Blue
- Green
- Grey
- Magenta
- Orange
- Pink
- Red
- Violet
- Yellow)
- Rapid Metro Gurgaon
- Lucknow–Kanpur Suburban Railway
- Barabanki–Lucknow Suburban Railway
- Delhi–Meerut RRTS
and workshops
- Northern Railway
- North Eastern Railway
- North Central Railway
- North Western Railway
- East Indian Railway Company
- Kangra Valley Railway
- Rajputana–Malwa Railway
- Tirhut Railway
- Oudh and Tirhut Railway
- Indian Branch Railway Company
- Oudh and Rohilkhand Railway
- Cawnpore–Burhwal Railway
- Cawnpore–Barabanki Railway
- Lucknow–Bareilly Railway
- Bengal and North Western Railway
- Rohilkund and Kumaon Railway
- Mashrak–Thawe Extension Railway
- Lucknow–Sitapur–Seramow Provincial State Railway
- Bareilly–Pilibheet Provincial State Railway
- Segowlie–Raxaul Railway
- Delhi Metro Rail Corporation
- National Capital Region Transport Corporation